Authorised Waaree channel partner  ·  Sevoke Road, Siliguri @solarverseindia

Home  /  Solarverse  /  Siliguri

Rooftop solar installer in Siliguri

Our store is on Sevoke Road and our team lives here. Waaree panels, WBSEDCL paperwork, one year of free maintenance.

Solar in Siliguri

Local roofs need local answers

Sized for the monsoonWe size to your year, so units banked in spring are not lost on 1 April.
Built for wind and hailGlass-glass Waaree modules on structures designed for the wind off the hills.
Terraces with tanksRaised structures that clear the tank and keep the terrace usable underneath.
WBSEDCL, handledFeasibility, net meter, inspection and the PM Surya Ghar claim, filed by us.

Siliguri at a glance

Electricity supplierWBSEDCL (West Bengal State Electricity Distribution Company)
Rooftop rulesWBERC rooftop solar (Prosumers) Regulations, 2025. Net metering from 1 kW up to 500 kW or your contract demand, whichever is lower. Surplus carries forward from bill to bill and resets to zero on 1 April.
Expected generation3.4 to 4.0 units per kWp a day on a shadow-free roof, about 1,241 to 1,460 a year
Sunshine on flat ground4.32 kWh per m² a day on average; strongest in April (5.4), weakest in January (3.2)
Noon sun40° above the horizon on 21 December, 87° on 21 June
Daylight10 h 27 min on 21 December, 13 h 49 min on 21 June
Winter parapet shadowA 3 ft parapet on the south edge shades about 3.6 ft of roof at noon on 21 December, and 4.8 ft at 9 am. Panels start beyond it.
Home subsidyPM Surya Ghar central assistance for homes on DCR panels, up to the 3 kW level. Amounts and process.

Sunshine, month by month

3.2J4.1F5.2M5.4A5.2M4.5J4.1J4.4A4.2S4.4O3.9N3.3D
Average daily sunshine on flat ground, kWh per m²; dashed line = yearly average. Source: NASA POWER, 2001–2020 averages at 26.73° N, 88.40° E. Sun angles and shadows are calculated for the solstices.
Where we work

All over Siliguri, and the hills beyond

Homes, shops, hotels, hospitals, schools, garment units and tea factories.

  • Sevoke Road, Hakimpara, Pradhan Nagar & Hill Cart Road
  • Champasari, Salugara, Bhaktinagar & Ektiasal
  • Matigara, Shivmandir, Bagdogra & Sukna
  • Fulbari, Rajganj & Jalpaiguri More
  • Naxalbari, Kharibari & Phansidewa
  • Dabgram, Uttorayon & the Eastern Bypass

And across North Bengal, Sikkim and Bihar: all the areas we serve.

Choosing an installer

Six things to check, with anyone

Use them on us too.

Authorised by the maker

Ask for the channel-partner certificate. Genuine, serial-traceable panels carry the maker’s warranty.

A make for every part

Panels, inverter, structure, cables, earthing and distribution boxes, each with its make and rating.

A band with winter and the monsoon in it

December makes far less than April. An honest quote shows the whole year.

Net metering, filed for you

Who files with WBSEDCL, who books the inspection and who pays which statutory fee.

A local number that answers

The people you call before the sale should be the people who come when a string is down in year four.

Warranty on paper

Module serials registered with the maker, and both warranties handed over at commissioning.

Check a quotation line by line ›

Visit us

Sevoke Road, Siliguri

Ground Floor, Radha Apartment, Iskcon Mandir Road, Sevoke Road, Siliguri 734001. Mon–Sat, 9:30 am – 7:00 pm.

NA
Nitesh Agarwal

Director

+91 96352 10101WhatsApp

PA
Pranay Agarwal

Director

+91 96359 10101WhatsApp

Get directions ›  ·  All the ways to reach us ›

Questions

Asked in Siliguri, every week

How do I choose a rooftop solar installer in Siliguri?

Look for an installer authorised by the panel maker, with a local office and its own service team, that names the make of every component and puts inclusions and exclusions in writing. Solarverse Solutions on Sevoke Road is an authorised Waaree channel partner. Our free quotation checker works on any installer’s quotation, ours included.

Is there a solar subsidy for homes in Siliguri?

Yes. Under PM Surya Ghar, homes on DCR (made-in-India cell) panels get central assistance of ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more, paid to your bank account after commissioning. We file the application and the claim for you.

Does WBSEDCL allow net metering in Siliguri?

Yes. A rooftop plant up to your sanctioned load can be net-metered under the WBERC 2025 regulations. Units you export are set off against units you use, surplus carries forward, and anything still banked on 1 April lapses, which is why we size to your yearly use.

How long does a rooftop installation take?

On a home the site work takes a few days; the overall timeline is mostly set by WBSEDCL’s net-metering process. Commercial and industrial plants typically take 45 to 60 days from the work order.

Do you also work in the hills and the Dooars?

Yes: Darjeeling, Kurseong, Kalimpong and Mirik, the Dooars tea belt, Jalpaiguri, Cooch Behar and Alipurduar, and Sikkim. Hill sites are always simulated individually. See all the areas we serve.

Bring three bills to Sevoke Road

Or send them on WhatsApp. You get a written sizing, whether or not you buy.