Sized to the shifts
Industrial plants are sized to the normal-hours block of the time-of-day bill. Surplus can move down to off-peak, never up to the 5–11 pm peak, so we do not oversize.
Home / Areas we serve / Durgapur & Asansol
Factories, warehouses, hospitals, schools and homes across the industrial belt.
The Durgapur–Asansol belt has some of the strongest sun in the state and more electricity suppliers than anywhere else in Bengal. Solarverse Solutions sizes plants here to your supplier, your time-of-day bill and your shifts, as an authorised Waaree channel partner.
| Electricity supplier | WBSEDCL in most areas; DPL in parts of Durgapur; IPCL in parts of the Asansol–Raniganj belt; DVC for some industrial connections |
|---|---|
| Rooftop rules | WBERC rooftop solar (Prosumers) Regulations, 2025. Net metering from 1 kW up to 500 kW or your contract demand, whichever is lower. Surplus carries forward from bill to bill and resets to zero on 1 April. |
| Expected generation | 3.4 to 4.0 units per kWp a day on a shadow-free roof, about 1,241 to 1,460 a year |
| Sunshine on flat ground | 4.65 kWh per m² a day on average; strongest in April (6.0), weakest in December (3.4) |
| Noon sun | 43° above the horizon on 21 December, 90° on 21 June |
| Daylight | 10 h 41 min on 21 December, 13 h 35 min on 21 June |
| Winter parapet shadow | A 3 ft parapet on the south edge shades about 3.2 ft of roof at noon on 21 December, and 4.3 ft at 9 am. Panels start beyond it. |
| Home subsidy | PM Surya Ghar central assistance for homes on DCR panels, up to the 3 kW level. Amounts and process. |
Industrial plants are sized to the normal-hours block of the time-of-day bill. Surplus can move down to off-peak, never up to the 5–11 pm peak, so we do not oversize.
WBSEDCL, DPL, IPCL or DVC: the regulation is the same WBERC one, but the application, the meter and the inspection go through your own supplier.
Industrial dust and very hot summers cut output if they are ignored. We plan walkways and cleaning points, leave air gaps under the modules and keep inverters out of the sun.
Plants of 100 kW and above need the Chief Electrical Inspector’s approval before switch-on, and fitness certificates are renewed every 2 to 3 years. We handle both.
Homes, shops, hotels, hospitals, schools, mills and factories.
It depends on the area. Most are on WBSEDCL; parts of Durgapur are on DPL, parts of the Asansol–Raniganj belt on IPCL, and some industrial units on DVC. Your bill says which. Net metering follows the WBERC 2025 regulations under all of them.
Big enough to cover the units in the normal-hours block of your bill, and no bigger than your contract demand or 500 kW for net metering. Surplus can be set off against off-peak units, never peak. Read how to size a factory plant.
Yes, noticeably if panels are left dirty. We design walkways and cleaning points into the layout and put a cleaning schedule in the maintenance plan.
Send your last three electricity bills and a photo of the roof on WhatsApp. You get a written sizing, whether or not you buy.